 | Tender no. PWA/GTC/009/09-10 Tender Subject Doha & Rayyan Sewerage Ain Khalid Area Sewerage – PH2 DA/09-10/C/0002/G Bond 20,000,000.00 Fees 8,000.00 Dept. Infrastructure Affairs Issue 13/05/2009 Submission 28/07/2009 Authorized 1+2+3 Scope of work The Project comprises design & construction of trunk and internal sewers in Phase 2 within Ain Khalid Area, QARS zone 56, Doha. The Works include but it is not limited to the following: a) Construction of 200 mm to 1000 mm diameter Vitrified Clay Sewers in trenches and via micro-tunneling method. b) Construction of GRP lined shallow, deep and very deep manholes. c) Construction of house connections. The Contractor shall construct, test & commission the whole of the works in this Contract. Preliminary investigations were conducted previously and the results of the topographical, geotechnical, geophysical and house connection surveys are available at IA for the Contractor’s review. Contacts Contracts Affairs Public Works Authority Fax No. (+974) 4950777
General Conditions a) Tender documents will be released only to authorized company representatives with following documentations at Contracts & Engineering Business Affairs (CEBA) (i) Letter of Authorisation on Company Letterhead (ii) Valid Qatar I.D. (iii) Valid copy of Commercial Registration (If applicable) b) Non-refundable tender fee is payable as above to PWA Account No. (0013-001813-052), Qatar National Bank c) Project document may be referring at Ashghal Tower, Ground Floor (Tender Issue office, CEBA), Al Corniche before purchasing from PWA. d) The Tender shall be submitted in two separate sealed envelopes (technical and financial offer) and both envelopes must be enclosed in a third sealed envelope which shall bear the tender number, subject and closing date. e) All Tenders shall be submitted in original and one copy or they will not be acceptance. f) Tenders shall be delivered at or sent to arrive not later than 1.00pm local Doha time on the closing date and deposited in the relevant Tender Box of concerned Tenders Committee’s Chairman at PWA. g) The successful Tenderer shall provide a Performance Bond in amount of ten (10%) percent of the Contract Price endorsed by a first class bank in Qatar
|